M/T Engelsberg II
![]() |
![]() |
M/T Engelsberg II (SMPA)
Built at Sölvesborgs Shipyard as new construction, hull number 73. She was delivered in April 1969. She was equipped with four Hedemora Pielstick V8A/12 delivering 2.350 kW. She was sold 1984 to Axel Johnson Chemical AB and registered 1985 on Rederi AB Lexa. She weighed from the beginning 3.820 Dw.tons but after lengthening 1975 she weighed 5.030 Dw.tons. She have new engine in 1997, one Wärtsilä 6L32 delivering 2.724 kW. at 720 rpm. Her registered owner are from January 1, 1998 Rederi AB Engelsberg (Nynäs Petroleum). 2000 in time- charter for Broström Shipping Management. Engelsbergs first commander was A. Reigo and chief engineer L. G. Nordin.
Before lengtening
| Length Over All | 106.50 m |
| Beam | 15,62 m |
| Depth | 5,60 m |
| Gross Tonnage | 3709 |
| Net. Registered Tonnage | 1957 |
| Deadweight Tonnage | 3820 |
After lengthening
| Length Over All | 122.93 m |
| Beam | 15,62 m |
| Depth | 5,74 m |
| Gross Tonnage | 4248 |
| Net. Registered Tonnage | 1278 |
| Deadweight Tonnage | 5030 |